Power Plant Boiler Water Wall Tubes
Power Steam Station VIR was used on unit number 18 boiler waterwall tubes northeast wall B1 burner. The inspection was carried out from the inside of the boiler. The tube specifications are ASME SA-213 Grade T2 Carbon Steel with 1” x .156” wall. An 18” area of inspection was identified, cleaned and buffed by maintenance department from tube 56 through tube 83. At the time of inspection, the tubes around the burners were a known problem area, although the current failure is the first in the past few years to cause a forced outage. Most of the failures are typically small pinhole leaks. A metallurgical evaluation was performed on a waterwall tube removed from the rear wall showed the tube leak is the result of corrosion fatigue – damage resulting from the combined effects of cyclic loading and a corrosive environment. Corrosion fatigue is typically located near attachments or restraints as these features give rise to large stresses during transient operating periods as thermal expansion is constrained.
To pinpoint the tubes with the worst corrosion fatigue beneath all four burners, VIR testing was performed, facilitating the replacement of the affected water wall section. VIR effectively identified inside diameter axial fatigue cracking on the water wall tube’s exterior. Please refer to Figure 8.

Figure 8 . VIR Report illustrates a Drawing with a Pulled Water Wall Tube

Brian K. Beresford “Bear”
Sole Proprietor
(832) 943-0979
10 Rosalie Street
Shepherd, Texas 77371